新聞(wén)中心
地址: | 河北省泊頭市道東街88号 |
電話(huà): | 0317-8185077 |
0317-8263980 | |
0317-8223128 | |
傳真: | 0317-8265584 |
e-mail: | hbydby@wadir.com.cn |
公司新聞(wén)
你所在位置:首(shǒu)頁 - - 新聞中(zhōng)心 - 公(gōng)司新聞(wén)kcb300齒(chǐ)輪泵流量18m3/h做潤(rùn)滑油(yóu)排油泵助(zhù)力四(sì)川成(chéng)達 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
發布時(shí)間:2015-4-3 9:05:28 點(diǎn)擊次(cì)數: | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
kcb300齒輪泵(bèng)流量18m3/h,壓力(lì)0.36mpa,吸入(rù)真空(kōng)高度3米,效(xiào)率42%,口(kǒu)徑70,電(diàn)機功率7.5kw kcb300齒輪圖(tú)片: kcb300整機安(ān)裝尺(chǐ)寸圖 kcb齒(chǐ)輪油泵(bèng)在輸(shū)油系(xì)統中(zhōng)可用作傳(chuán)輸、增(zēng)壓泵;kcb gear oil pump in the oil system can be used as a transport, booster pump; 在燃油系(xì)統中可用(yòng)作輸(shū)送、加(jiā)壓(yā)、噴射的(de)燃油(yóu)泵;in the fuel system can be used as a transport, pressure, jet fuel pump; 在一切工業領域中,均(jun1)可作潤(rùn)滑油泵用。in all industrial areas, can be used as lubricating oil pump. kcb齒(chǐ)輪(lún)泵主要(yào)有齒輪(lún)、軸、泵體(tǐ)、安全(quán)閥、軸(zhóu)端密封(fēng)所組成。齒輪經熱(rè)處理有較(jiào)高的硬度和強度,與軸(zhóu)一同安裝在可更換的軸套内運轉。泵(bèng)内全部零(líng)件的潤滑(huá)均在泵工(gōng)作時利用(yòng)輸出(chū)介質(zhì)而自動達(dá)到。kcb gear pump are mainly gear, shaft, pump body, valve, shaft end seal. gear after heat treatment with high hardness and strength, and shaft installed in the replaceable shaft sleeve. in all parts of the lubrication pump are pump work automatically to achieve using the output media. 泵内有設計(jì)合理的洩油(yóu)和(hé)回油槽,是(shì)齒輪在工作(zuò)中承受(shòu)的扭(niǔ)矩力最小(xiǎo),因此軸承(chéng)負荷(hé)小,磨(mó)損小,泵效率高(gāo)。pump is the drainage and back into the groove of reasonable design, is a gear in the work under the minimum torque force, so the bearing load is small, wear small, pump with high efficiency.
泵設有安(ān)全閥作(zuò)為超載(zǎi)保護(hù),安(ān)全閥的(de)全回(huí)流壓力為(wéi)泵額(é)定排除(chú)壓(yā)力的1.5倍,也可在(zài)允許(xǔ)排出壓力(lì)範圍(wéi)内根據實(shí)際需要另(lìng)外調(diào)整。但注意本(běn)安全閥(fá)不能作減(jiǎn)壓閥的長期工(gōng)作,需要時可在(zài)管(guǎn)路(lù)上另(lìng)行安(ān)裝。從主軸外伸(shēn)端向(xiàng)泵(bèng)看(kàn),為順時針(zhēn)旋轉。pump is equipped with safety valve as overload protection, the total reflux pressure relief valve is rated pump out pressure of 1.5 times, also can allow discharge pressure range according to actual needs and adjust. but note that this cannot be a long-term work pressure reducing valve, relief valve can be installed in the piping shall be separately when necessary. to pump from the main shaft overhang end to see, for clockwise. kcb齒輪(lún)泵安(ān)裝順(shùn)序: kcb gear pump installation order:
1、在安裝過程中,為(wéi)防止雜物落入機器(qì)内,機組的(de)所有孔眼均應(yīng)蓋好(hǎo)。1, during the installation process, so as to prevent debris into the machine, all perforation should cover of the unit. 2、在接(jiē)好管(guǎn)路及确(què)定電動(dòng)機轉動方向後(hòu),再接(jiē)上聯軸器(qì),并再(zài)校核一遍軸的(de)同心度。2, good on the line and determine the direction of motor rotation, and coupling is connected, check it again and shaft concentricity. 3、校(xiào)正泵(bèng)軸和電機(jī)軸的同心(xīn)度(dù),在(zài)聯軸大(dà)路外圓上,允許偏差0.1毫(háo)米;兩聯軸器平面的間(jiān)隙(xì)應保(bǎo)證2~4毫米,(小泵取小值(zhí))間隙(xì)要均(jun1)勻,允差0.3毫米。3, calibration of pump shaft and motor shaft concentricity, cylindrical, along the road in coupling allowable deviation of 0.1 mm;in the plane of the two coupling gap should guarantee 2 ~ 4 mm, small little pump (in value) clearance wants even, tolerance of 0.3 mm. 4、将(jiāng)機組放在埋有(yǒu)地腳(jiǎo)螺栓的基(jī)礎上,在底(dǐ)座與基礎之間(jiān),用成(chéng)對的楔墊用校(xiào)正用。4, put the unit in buried with anchor bolt, on the basis of between the base and foundation, with pairs of wedge cushion with correction. 5、為(wéi)防(fáng)止管(guǎn)線中雜物進入泵内(nèi),對(duì)新安裝(zhuāng)的管線,在(zài)泵膠應裝設(shè)過濾器(qì),其有(yǒu)效(xiào)截面應(yīng)大于(yú)吸入管截(jié)面的2~3倍(bèi)。5, in order to prevent debris into the pump in the pipeline, pipeline of new installation glue should be installed in the pump filters, the effective cross section should be greater than the suction pipe section 2 ~ 3 times. 6、松開聯軸大(dà),用水(shuǐ)平儀分别放在泵軸(zhóu)和底座上,通過調整楔(xiē)墊(niàn),校正(zhèng)機組(zǔ)水平,适當(dāng)擰緊地腳螺栓(shuān),以防走動。6, loose coupling, use level on the pump shaft and base, respectively, by adjusting the wedge cushion, correction unit level, tighten the anchor bolts, just in case. 7、在機(jī)組實(shí)際試運行2~3小時(shí)後(hòu),作最後(hòu)檢查,如無不良(liáng)現象,則認為安(ān)裝合格。 7, in the actual commissioning unit 2 ~ 3 hours later, a final inspection, if there is no negative phenomenon, is considered qualified installation.
|
傳真(zhēn):0317-8265584 e-mail:hbydby@wadir.com.cn備案号:冀icp05010751号-3